Green Jade – for CSBC

C-Job supported CSBC with basic design and main crane integration for the Green Jade, the first heavy lift and offshore wind installation vessel built in Taiwan. The vessel, which features a crane with 4,000 tons of lifting capacity and DP3 capability, was launched by CDWE, a joint venture between CSBC and DEME Offshore, and entered service in 2023.

Ursa – for Työvene

The Ursa, a trailing suction hopper dredger (THSD), was built by the Työvene shipyard for the Maritime office of Gdynia, and is the first of their fleet.

C-Job was responsible for the concept, basic and detail design, and the integration of dredging equipment.

Lorraine Hooks – for Mike Hooks LLC

C-Job completed the concept, basic, and detail design, plus systems integration for the 27-inch cutter section dredger Lorraine Hooks, for US dredging company, Mike Hooks LLC. We collaborated closely with SPI/Mobile Pulley Works (MPW) who constructed the dredge equipment in Alabama, and Southwest Shipyards in Texas, who built the vessel. The Lorraine Hooks was delivered to its owner in 2023.

Orion – for DEME

The Orion is a floating DP3 offshore installation vessel designed to support offshore wind parks with mega foundations and turbines. The vessel, which was a first of its kind, is a sister ship to the Green Jade. It was delivered to DEME in 2022 and currently sails around the world to perform installations for offshore wind projects.

Vox Amalia – for Van Oord

C-Job collaborated with Van Oord, a global leader in dredging and marine construction, for the development of the Vox Amalia, a trailing suction hopper dredger (TSHD) with a capacity of 18,900 m³. Van Oord provided the business case and operational requirements, while C-Job performed a feasibility study, concept design, basic design review, and detail design, and provided building supervision support.

Dr. Wagemaker – for TESO 

C-Job are proud to have collaborated with Texels Eigen Stoomboot Onderneming (TESO) to engineer a significant upgrade for its Dr. Wagemaker ferry. The project scope was to integrate a cutting-edge mooring system and reinforce the vessel’s hull to accommodate the modernization, which would improve both operational efficiency and sustainability.